| Date |
Description
and size of large image in KB
|
Image
|
16
May 2005
|
Greg
and Jeff installing the MOS dewar (upper black ring) and Adapter ring
(lower down, close to the floor) into the new Handling and Flexure Cart
(yellow assembly that Jeff's standing on top of) (350 KB).
|

|
16
May 2005
|
Greg
holding the MOS dewar (340 KB).
|

|
16
May 2005
|
Greg
and Jeff during the assembly (344 KB).
|

|
16
May 2005
|
The
front end of the Camera dewar prior to mating it with the Adapter
ring. The green item at the bottom is the cold head. The
vacuum gate valve, vacuum interface cone and bellows are nicely viewed
here (312 KB).
|

|
16
May 2005
|
The
orange engine hoist is holding the Adapter ring, as the two hydrolic
lifts are not yet installed onto the cart (344 KB). The yellow
cart is attached to the Adapter ring.
|

|
16
May 2005
|
A
face view of the Adapter Ring (296 KB). The green thing in the
upper left is a cold head.
|

|
16
May 2005
|
The
Camera dewar is attached to the Adapter Ring and MOS dewar, and they
are all in the Handling and Flexure Cart (338 KB).
|

|
16
May 2005
|
Another
view of F-2 in the Handling and Flexure Cart (334 KB). Jeff is
visible to the left of the image, holding the last cross piece of the
cart.
|

|
16
May 2005
|
End
view of the cart, with F-2 almost vertical (339 KB).
|

|
16
May 2005
|
Another
view of F-2 in the cart, almost vertical; Jeff is holding onto it (338
KB).
|

|
16
May 2005
|
Another
view, similar to the above image (329 KB).
|

|
18
May 2005
|
F-2
in the clean room while on the Handling and Flexure Cart. The
Camera dewar vacuum jacket is removed, and various components are being
test fitted to the optical bench (339 KB).
|

|
16
May 2005.
|
Greg
and Jeff next to F-2, hanging vertically in the cart (302 KB).
|

|